Past review
The Central Brisbane River water supply scheme is located between the Wivenhoe Dam and Mt Crosby Weir.
The Central Brisbane River water supply scheme was established in 1980 to enable irrigation of up to 1,000ha around the Brisbane River.
The scheme (also known as the Mid-Brisbane Zone) has 136 bulk customers, including 131 irrigators holding 6,771ML of medium priority water access entitlements.
The Scheme is regulated under the Moreton Resource Operations Plan (ROP) which was issued in December 2009. The Moreton ROP defines water sharing rules based on the combined usable volumes of both Wivenhoe Dam and Somerset Dam.
The QCA has released its final recommended prices for the Central Brisbane River scheme for 2013-17.
The Minister accepted the QCA’s recommendations, which will apply from 1 January 2014 to 30 June 2017.
Proposed changes mean all Seqwater schemes will now have two-part tariffs consisting of a fixed (Part A) price per megalitre (ML) of nominal water allocation and a usage (Part B) price per ML of water use.
Central Brisbane River water charges
2013-14 | 2014-15 | 2015-16 | 2016-17 | |
---|---|---|---|---|
Fixed ($/WAE) | 15.11 | 17.54 | 20.08 | 22.73 |
Variable ($/ML) | 10.14 | 10.40 | 10.65 | 10.92 |
As projected 2013-14 revenues are below cost-reflective revenues, the QCA recommends a price path where fixed charges increase annually by $2 per ML (plus inflation) until cost-reflective levels are reached.
Volumetric charges are increased at inflation over the balance of the regulatory period.
This Seqwater water scheme review forms part of the review that the QCA undertook in 2012-13 for the Queensland Government: the Seqwater Irrigation Price Review 2013–17.
You can read more about the pricing review on our project home page. You can also view the submissions for the water schemes that we received, the consultants’ reports and issues arising from face-to-face consultation with stakeholders.
- Key to the findings were the recovery of Seqwater’s costs and the smoothing of future price increases.
- All Seqwater schemes will now have two-part tariffs consisting of a fixed (Part A) price per megalitre (ML) of nominal water allocation and a usage (Part B) price per ML of water use.
- For the majority of schemes, our recommended prices result in increases to fixed prices and reductions in usage prices.
Report and papers
|
Title | Document | |
---|---|---|---|
15 May 2013 | Fact sheet | Fact Sheet – Central Brisbane River | pdf, 99.02 Kb |
|
Title | Document | |
---|---|---|---|
15 May 2013 | Final report | Irrigation Price Review: 2013-17 – Volume 1 | pdf, 2.12 Mb |
14 May 2013 | Final report | Irrigation Price Review: 2013-17 – Volume 2 – Central Brisbane River | pdf, 596.62 Kb |
|
Title | Document | |
---|---|---|---|
14 December 2012 | Draft report | Irrigation Price Review: 2013-17 – Volume 1 | pdf, 1.89 Mb |
14 December 2012 | Draft report | Irrigation Price Review: 2013-17 – Volume 2 – Central Brisbane River | pdf, 486.37 Kb |
|
Title | Document | |
---|---|---|---|
15 May 2013 | Consultant report | Deloitte – Report on Review of the Seqwater Irrigation Pricing Model | pdf, 444.60 Kb |
15 March 2013 | Consultant report | Sinclair Knight Merz (SKM) – Seqwater Irrigation Price Review 2013-2017 – Assessment of Capital | pdf, 4.28 Mb |
14 December 2012 | Consultant report | Sinclair Knight Merz (SKM) – Seqwater Irrigation Price Review 2013-2017 – Assessment of Capital (1) | pdf, 4.28 Mb |
15 March 2013 | Consultant report | Sinclair Knight Merz (SKM) – Seqwater Irrigation Price Review 2013-2017 – Assessment of Capital and | pdf, 956.91 Kb |
|
Title | Document | |
---|---|---|---|
15 March 2013 | Submission | Department of Natural Resources and Mines (DNRM) – Submission re: Seqwater 2013-17 Irrigation Pr | pdf, 28.74 Kb |
15 March 2013 | Submission | Department of Natural Resources and Mines (DNRM) – Submission re: Seqwater 2013-17 Irrigation Pr | pdf, 79.60 Kb |
15 February 2013 | Submission | Department of Natural Resources and Mines (DNRM) – Submission re: Seqwater 2013-17 Irrigation Pr (2) | pdf, 2.37 Mb |
15 March 2013 | Submission | Department of Natural Resources and Mines (DNRM) – Submission re: Seqwater 2013-17 Irrigation Price | pdf, 30.94 Kb |
|
Title | Document | |
---|---|---|---|
15 May 2012 | Submission | Cover Letter | pdf, 210.71 Kb |
15 May 2012 | Submission | Irrigation Prices Submission | pdf, 1.11 Mb |
15 May 2012 | Submission | Irrigation Prices Submission – Attachment 2 Renewals Methodology | pdf, 1.37 Mb |
15 May 2012 | Submission | Irrigation Prices Submission – Attachment 3 Headworks Utilisation Factors | pdf, 713.73 Kb |
15 May 2012 | Submission | Central Brisbane River NSP | pdf, 1.36 Mb |
15 May 2012 | Submission | Central Brisbane River Tariff Group Summary | pdf, 430.00 Kb |
|
Title | Document | |
---|---|---|---|
06 February 2014 | Minister’s direction | Seqwater irrigation Ministers’ Direction Notice | pdf, 56.53 Kb |